Howman59
Well-known member
- First Name
- David
- Joined
- Feb 23, 2022
- Threads
- 1
- Messages
- 102
- Reaction score
- 116
- Location
- Nashville Area
- Vehicles
- 2022 F150 PB On Order
Me too!!I got one too, and got excited until I actually opened it. ?
Sponsored
Me too!!I got one too, and got excited until I actually opened it. ?
Platinums and KR seem to take longer than lower trims, at least looking at the info on these forums.What exactly do you mean in regards to the Platinum and Powerboost combo?
I was told the regular bed could delay it, but I am in Texas and there are nearly just as many 250s with the regular bed out there as 150s with the short bed.
In regards to aftermarkets, one salesperson told me they had a truck sitting for 2 months waiting on aftermarket lugnuts.
The only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.FTR, what does this really mean in terms of scheduling?
Tha last for that explanation.The only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.
This tells us nothing about previously scheduled orders (orders which have a VIN and therefore already an estimated build date). Previously scheduled orders (orders already with a VIN and date) may be assigned for build on a date (week) even if that date (week) is not shown as open for unscheduled orders addressed on these reports.
Thanks for the clarificationThe only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.
This tells us nothing about previously scheduled orders (orders which have a VIN and therefore already an estimated build date). Previously scheduled orders (orders already with a VIN and date) may be assigned for build on a date (week) even if that date (week) is not shown as open for unscheduled orders addressed on these reports.
I received this same email Friday night. I ordered my 22 F150 XLT 302high Black Appearance Package on 1/6/22. I'm hoping by June or July I'll have my truck but By the looks of some of you guys on here I could be waiting longer lol. I'll just keep extending my current lease until it comes it. If it's much longer I'll just buy my lease outright then sell it for a premium.Not sure I understand this e/mail, received tonight at 8:45 Central. It essentially says nothing other than……’sorry Bub’
For clarity, I placed my order and got an confirmation e/mail from Ford in November 2021.
Makes sense to me.... however, I've had a VIN for a few months now and continue to get my build dates pushed. I found this site while researching why this is happening, and so far each push has aligned to what is shown on the sheet.The only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.
This tells us nothing about previously scheduled orders (orders which have a VIN and therefore already an estimated build date). Previously scheduled orders (orders already with a VIN and date) may be assigned for build on a date (week) even if that date (week) is not shown as open for unscheduled orders addressed on these reports.
six months and i have not seen vin or email one from ford started as a 21 platinum with power boost now its a 22 according to my dealerWell this is encouraging. Today marks three months since I ordered and still no VIN, maybe this week....
called my dealer he told me I'm a priority 2 hope and cross my fingers been waiting since aug 21
Any orders placed that do not yet have a VIN assigned have the potential to get a VIN and build date for the dates listed.how does one read this chart? It’s kinda confusing tbh
Jobu needs rumWoooooooo. Now to get busy on that VIN. Just need to find a chicken