Sponsored

Howman59

Well-known member
First Name
David
Joined
Feb 23, 2022
Threads
1
Messages
102
Reaction score
116
Location
Nashville Area
Vehicles
2022 F150 PB On Order

Mtnman1

Well-known member
First Name
Tod
Joined
Feb 9, 2022
Threads
8
Messages
1,660
Reaction score
1,561
Location
Ohio
Vehicles
2022 F150 RCSB FX4
Occupation
Engineer
What exactly do you mean in regards to the Platinum and Powerboost combo?

I was told the regular bed could delay it, but I am in Texas and there are nearly just as many 250s with the regular bed out there as 150s with the short bed.

In regards to aftermarkets, one salesperson told me they had a truck sitting for 2 months waiting on aftermarket lugnuts.
Platinums and KR seem to take longer than lower trims, at least looking at the info on these forums.
 

Buyer2021

Well-known member
Joined
Feb 9, 2021
Threads
24
Messages
1,658
Reaction score
2,870
Location
TX
Vehicles
2022 Lariat SuperCab and 2005 XLT SuperCab
Occupation
retired!
FTR, what does this really mean in terms of scheduling?
The only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.

This tells us nothing about previously scheduled orders (orders which have a VIN and therefore already an estimated build date). Previously scheduled orders (orders already with a VIN and date) may be assigned for build on a date (week) even if that date (week) is not shown as open for unscheduled orders addressed on these reports.
 

DarkSkyForever

Well-known member
Joined
Dec 29, 2021
Threads
4
Messages
346
Reaction score
400
Location
MN
Vehicles
2018 Mustang GT, 2022 F150 701A (Ordered)
Occupation
Software Engineer
I read somewhere that this upcoming scheduling bank will be custom orders only, no retail scheduling.
If that's true, I'd imagine that a majority will be Lightnings since I don't see a separate line for those trucks.
 

ARegularJoe

Well-known member
First Name
Joe
Joined
Feb 6, 2022
Threads
10
Messages
242
Reaction score
88
Location
USA
Vehicles
Feb 2 Order: 22 Lariat 500A/3.5 EB/FX4/Max Tow/+
The only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.

This tells us nothing about previously scheduled orders (orders which have a VIN and therefore already an estimated build date). Previously scheduled orders (orders already with a VIN and date) may be assigned for build on a date (week) even if that date (week) is not shown as open for unscheduled orders addressed on these reports.
Tha last for that explanation.
 

Sponsored

ARegularJoe

Well-known member
First Name
Joe
Joined
Feb 6, 2022
Threads
10
Messages
242
Reaction score
88
Location
USA
Vehicles
Feb 2 Order: 22 Lariat 500A/3.5 EB/FX4/Max Tow/+
The only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.

This tells us nothing about previously scheduled orders (orders which have a VIN and therefore already an estimated build date). Previously scheduled orders (orders already with a VIN and date) may be assigned for build on a date (week) even if that date (week) is not shown as open for unscheduled orders addressed on these reports.
Thanks for the clarification
 

FordMaster

Member
First Name
Shane
Joined
Nov 11, 2021
Threads
0
Messages
12
Reaction score
13
Location
Michigan
Vehicles
66 Lincoln, 90 Lincoln Mark VII, 96 F150, 2019 Fle
Occupation
Landscaping
Not sure I understand this e/mail, received tonight at 8:45 Central. It essentially says nothing other than……’sorry Bub’

For clarity, I placed my order and got an confirmation e/mail from Ford in November 2021.

9204BA97-3113-4753-A7A3-BC402F4D2433.jpeg
I received this same email Friday night. I ordered my 22 F150 XLT 302high Black Appearance Package on 1/6/22. I'm hoping by June or July I'll have my truck but By the looks of some of you guys on here I could be waiting longer lol. I'll just keep extending my current lease until it comes it. If it's much longer I'll just buy my lease outright then sell it for a premium.
 

Bannerman

Well-known member
First Name
Johnson
Joined
Jan 3, 2022
Threads
6
Messages
528
Reaction score
625
Location
Charlotte, NC
Vehicles
2022 Tremor 402A, 2022 4Runner ORP
Well this is encouraging. Today marks three months since I ordered and still no VIN, maybe this week....
 

coconutgroves

Active member
Joined
Mar 18, 2022
Threads
2
Messages
33
Reaction score
23
Location
Texas
Vehicles
2022 F-150 Platinum 4x4
The only thing these so-called 'production schedules' tell us is that previously unscheduled (no VIN) orders may be assigned for build on the referenced date (week). In other words, this is a report showing scheduling opportunities for vehicles in the Un-Scheduled Order Bank (USOB), nothing more.

This tells us nothing about previously scheduled orders (orders which have a VIN and therefore already an estimated build date). Previously scheduled orders (orders already with a VIN and date) may be assigned for build on a date (week) even if that date (week) is not shown as open for unscheduled orders addressed on these reports.
Makes sense to me.... however, I've had a VIN for a few months now and continue to get my build dates pushed. I found this site while researching why this is happening, and so far each push has aligned to what is shown on the sheet.

I am supposed to be built the week of 4/18 now (from previous 4/4, which was pushed a few times previously, each time 2 weeks out), but at this rate, I expect that to push as well.
 

JimMoran

Well-known member
First Name
Jim
Joined
Dec 20, 2021
Threads
1
Messages
131
Reaction score
106
Location
Bloomer, WI
Vehicles
2004 T-Bird, 2020 Explorer ST, 2022 F150 Lariat
Occupation
retired
Still waiting on my XLT Supercrew Antimatter Blue, 5.5' bed, 40 console 40, 302A, 5.0, LT265 tires, 6" extended running boards, 3.31 locking, engine block heater, co-pilot 360, Power sliding rear window, trailer tow, FX4, Power adjustable pedals, 36 gal fuel tank, Bed Utility, 360 degree camera, Snow Plow Prep---Ordered 10/29.
 

Sponsored


super sparky

Well-known member
First Name
Dale
Joined
Nov 5, 2021
Threads
0
Messages
53
Reaction score
14
Location
galesburg IL
Vehicles
two ford transits, ford edge st
Occupation
electrical contractor
Well this is encouraging. Today marks three months since I ordered and still no VIN, maybe this week....
six months and i have not seen vin or email one from ford started as a 21 platinum with power boost now its a 22 according to my dealer
 

DarkSkyForever

Well-known member
Joined
Dec 29, 2021
Threads
4
Messages
346
Reaction score
400
Location
MN
Vehicles
2018 Mustang GT, 2022 F150 701A (Ordered)
Occupation
Software Engineer
how does one read this chart? It’s kinda confusing tbh
Any orders placed that do not yet have a VIN assigned have the potential to get a VIN and build date for the dates listed.
 

Paddler

Member
First Name
Terry
Joined
Jul 22, 2021
Threads
1
Messages
21
Reaction score
29
Location
Medina, Ohio
Vehicles
2022 F150 Platinum Powerboost
 




Top