- Joined
- Dec 22, 2019
- Threads
- 461
- Messages
- 942
- Reaction score
- 1,787
- Location
- Purple State
- Vehicles
- F-150
- Occupation
- Admin
- Thread starter
- #1
Sponsored
Nope, just scheduling for the week of 4/4. They will schedule what they can with the parts they have.Sorry, I’m not fully understanding these build charts.
Am I interpreting this correctly: All 2022 F-150 orders processed by 1/31/2022 will be produced on 4/4/2022?
Ok. I’ll try again. Chart means that right now, Ford is already scheduling F-150 builds out to 4/4/22. Which means, if I haven’t received a VIN#/build-email from Ford (and I haven’t yet, for my 12/23/2022 500A PB), then my future ‘22 F-150 won’t be built until after 4/4/22.Nope, just scheduling for the week of 4/4. They will schedule what they can with the parts they have.
That is correct.Ok. I’ll try again. Chart means that right now, Ford is already scheduling F-150 builds out to 4/4/22. Which means, if I haven’t received a VIN#/build-email from Ford (and I haven’t yet, for my 12/23/2022 500A PB), then my future ‘22 F-150 won’t be built until after 4/4/22.
You’re close I think.Ok. I’ll try again. Chart means that right now, Ford is already scheduling F-150 builds out to 4/4/22. Which means, if I haven’t received a VIN#/build-email from Ford (and I haven’t yet, for my 12/23/2022 500A PB), then my future ‘22 F-150 won’t be built until after 4/4/22.
So, my F-150 initially ordered 5/1/21 won't be built before 4/4. (Still clean unscheduled.) Wow. Maybe I will chronologically lap myself. That must be an achievement somewhere. Gold star I assume.Ok. I’ll try again. Chart means that right now, Ford is already scheduling F-150 builds out to 4/4/22. Which means, if I haven’t received a VIN#/build-email from Ford (and I haven’t yet, for my 12/23/2022 500A PB), then my future ‘22 F-150 won’t be built until after 4/4/22.
When was your MY21 order changed to MY22?So, my F-150 initially ordered 5/1/21 won't be built before 4/4. (Still clean unscheduled.) Wow. Maybe I will chronologically lap myself. That must be an achievement somewhere. Gold star I assume.
Early November. I was bumped up to a priority 2 at that time.When was your MY21 order changed to MY22?
My truck was bumped to a MY22 truck 11/22/21. The priority was moved to 19.Early November. I was bumped up to a priority 2 at that time.
sounds like we are in almost the same boat. Will be over a year since ordered before I see my truckSo, my F-150 initially ordered 5/1/21 won't be built before 4/4. (Still clean unscheduled.) Wow. Maybe I will chronologically lap myself. That must be an achievement somewhere. Gold star I assume.
This is depressing. I ordered 12/12 and got my confirmation email almost immediately. Dealer says I’m a priority 2 now. I thought that was a good thing, but I’ve seen a few people claiming they’ve been priority 2 for months.sounds like we are in almost the same boat. Will be over a year since ordered before I see my truck
What does cleanup mean? XLT ordered 10/29, 1st delay snow plow prep, then 5.0 motor, latest update 2 weeks ago, constraint delay.