OCDoug
Well-known member
- First Name
- Doug
- Joined
- Dec 9, 2020
- Threads
- 0
- Messages
- 210
- Reaction score
- 202
- Location
- Orange County, CA
- Vehicles
- f150, focus, corolla
- Occupation
- Software Engineer
My truck was produced on 3/17... no updates still.
This is very interesting... I'll have to ask my dealer if he has any idea what an "open trace" is... I'd love to know if anything is actually happening to my truck....They stated there was an “open trace” on the vehicle. They mentioned something about traces being opened on all partially built trucks so they (Ford) could know what was being waited on for all orders. Not sure of the accuracy of the statement, but maybe some others here will have some insight.
You got my hopes up with this one. It likely means something, although it may or may not mean progress. Unfortunately, mine still has the 1990-01-01 eta end date.My Lariat was produced on 3/25 and sitting on Ramp 59 since then. Yesterday I noticed that ETA of 1990-01-01 was removed, with no ETA. I was hoping that was good news and soon it would turn into a delivery date.
Sponsored