KSB7503
Member
Priority code was 10You must of had a low priority code. I ordered my truck on March 11th and it still hasnt been built.
Sponsored
Priority code was 10You must of had a low priority code. I ordered my truck on March 11th and it still hasnt been built.
Figured. i'M at 19 an i'm also in S.FL.Priority code was 10
Well, mine has been showing “In production” since the 24th last month. The Ford tracker also shows an ETA of the 12th.It is all over the place. Our truck was produced 4/26 but hasn’t gone anywhere since then and we don’t have any offsite items to be added. Just a Lariat 502A PB going to TX at some point. ETA is still in the future, but no rhyme or reason even on those just recently built over the past couple of weeks. For a while it seemed like most trucks shipped out recently were N/NE locations, until I started seeing some FL areas.
that what I'm thinking too ...Well, mine has been showing “In production” since the 24th last month. The Ford tracker also shows an ETA of the 12th.
my salesman told me yesterday what he was looking at said the 22nd...of June.
I see other trucks similar getting delivered. So I’m not sure what the hangup is.
I’m starting to think it’s just luck, being built at the right time when a shipment of parts come in. Trucks that are on the assembly line at that time get done...those sitting out waiting, well, we could finish them but it would take longer bringing them back here vs just building what’s on the line right now...
I ordered my Platinum Hybid on 1/25/21,. I have a VIN and the dealer told me a couple of weeks ago it had a build date of 5/17. But when I checked the VIN it doesn't show a build date?? Seems to be no rhyme or reason to orders in and what's coming out. Just trying to patiently wait.I ordered on Jan 25, built March 30, still in production. Dealer says best case is I get it in 6 weeks, worst case October. 2.7 502A Lariat, power boards and bedliner as well.
I'm glad you're getting your truck, but I'm a bit pissed that they're filling orders that went through a week before mine was produced and mine is still rusting away.
Same here, built March 30th. Still in production, but a KR with a number of options but no bed liner or wheel well liners. Now if my truck isn’t delivered before the 22‘s come out, why take a 21. However, I did score three out of the 7 options causing delays, not to mention micro chips.I ordered on Jan 25, built March 30, still in production. Dealer says best case is I get it in 6 weeks, worst case October. 2.7 502A Lariat, power boards and bedliner as well.
I'm glad you're getting your truck, but I'm a bit pissed that they're filling orders that went through a week before mine was produced and mine is still rusting away.
If you're referring to the Production Date in the tracker on this site, that won't be populated until your truck comes off the assembly line, hopefully on 5/17.I ordered my Platinum Hybid on 1/25/21,. I have a VIN and the dealer told me a couple of weeks ago it had a build date of 5/17. But when I checked the VIN it doesn't show a build date?? Seems to be no rhyme or reason to orders in and what's coming out. Just trying to patiently wait.
I know that where I work the hardware team has already been told by one of the suppliers that there will be both parts shortages throughout 2022 and the price of new devices will be increasing. So this looks like its going to be a one two punch of paying more and receiving less.I dont know. The shortage will continue into the 2122 model year. There are not many 2021s sitting around
not claimed.