Djlee1592
Well-known member
- First Name
- Dave
- Joined
- Jan 19, 2021
- Threads
- 9
- Messages
- 225
- Reaction score
- 170
- Location
- Upstate New York
- Vehicles
- 2021 F-150
- Occupation
- industrial mechanic
yeah I'm doing just the cupholder and footwells, front and rear. No media bin and my truck already has the glove box lights as well as the hookups already in place for the front ambient. But 2 hours is good. I have to borrow a garage so just getting an estimateDepends a bit on what your truck has and what you want done. I have a very similar truck to yours. I had the footwell connectors already and I only wanted the footwells and lighted cup holders (with XLT and media bin cover didn't want to do that and I solved the glove box light a different way). So got the harness and wire jumper from JHForman812. With those in hand I would say took me total ~2 hrs but I went super slow to ensure I didn't make any mistakes and didn't snap any of the 6 console bolts. Also first time I had snapped off trim so went super slow on that.
I did in 2 steps. Installed the footwell lights (just snap in), jumper and the harness. Then came back and did the cupholder light the next day.
Media bin and glove box takes more time as there is some cutting to do unless u already have the holes (some did).
Great writeups in this thread and John is a great help.
Hope this helps.
Sponsored