Sponsored

06/6/22 Build Week Group

shark1987

Well-known member
First Name
Brian
Joined
Jan 26, 2022
Threads
1
Messages
67
Reaction score
75
Location
Cypress, TX
Vehicles
2022 Lariat 4x4
Hmmm... I might be one of the only ones in this thread who ordered the 5.0. Although, with gas prices the way they are, I'm wondering if that was a smart decision. I almost wonder if that is why mine was built at the KC plant? Maybe not though?
PowerBoost (and Rapid Red paint) is only built in Dearborn so yea possibly that means more 5.0 get built in KC.
Sponsored

 

64Wing

Well-known member
Joined
Apr 1, 2022
Threads
3
Messages
190
Reaction score
197
Location
Michigan
Vehicles
2014 Fusion Titanium, 2022 F150 SCREW Lariat 502a
Occupation
Aviation
Sequence 3073. Let's see how this goes...
 

64Wing

Well-known member
Joined
Apr 1, 2022
Threads
3
Messages
190
Reaction score
197
Location
Michigan
Vehicles
2014 Fusion Titanium, 2022 F150 SCREW Lariat 502a
Occupation
Aviation
Also I did confirm that Space White is exclusive to KC. Rapid red, Dearborn. Power running boards are exclusive to Dearborn
 

BuddyT

Well-known member
First Name
Buddy
Joined
Nov 12, 2021
Threads
0
Messages
65
Reaction score
87
Location
Washington
Vehicles
2022 F-150 Platinum FX4 BAP PB
Which number is the sequence number on the WS?
My blend date was also 6/6. My sequence number is 2033. So far no module data for me either. I have been checking a lot.
 

Bart

Well-known member
Joined
Mar 7, 2022
Threads
9
Messages
203
Reaction score
188
Location
Indiana
Vehicles
22 Lariat 502A EB BAP (ordered 1/15)
My blend date was also 6/6. My sequence number is 2033. So far no module data for me either. I have been checking a lot.
My sequence number is 2035 with the same blend date. Looks like our trucks are only one truck apart
 

Sponsored

SWillier

Well-known member
First Name
Sonny
Joined
Mar 14, 2022
Threads
3
Messages
128
Reaction score
149
Location
ARVADA
Vehicles
2013 F150 & 2022 F150 on order
Occupation
Architect
My blend date was also 6/6. My sequence number is 2033. So far no module data for me either. I have been checking a lot.
Another number to note is your order in line on that Blend day. Sequence (6791 on mine) number is a rolling number that doesn't really tell you much unless you know everyone else's. From what I've seen in other descriptions, this order number is where you are in line. Mine is 1005 out of 1695 on 6/10.

Ford F-150 06/6/22 Build Week Group 1654711821472
 

jwinthro

Well-known member
First Name
JT
Joined
Oct 17, 2020
Threads
1
Messages
75
Reaction score
68
Location
Los Angeles, CA
Vehicles
2022 F-150 CG Lariat BAP 4x4
Occupation
Sales
Ahhh I see that. So I was towards the end of the day on 6/7 (2178/2278). So maybe they took smoke breaks and will finish it this morning 🤣
 

dothedew

Well-known member
Joined
May 19, 2021
Threads
21
Messages
151
Reaction score
150
Location
Colorado
Vehicles
Kia Telluride, Model 3 Performance
My XL had a blend date of 6/6. sequence of 5254. says 1107/2346.
Ford order site says built and awaiting shipment 6/7.

The modules screen is populated although the header is BCE Modules not BCM.
 

Bart

Well-known member
Joined
Mar 7, 2022
Threads
9
Messages
203
Reaction score
188
Location
Indiana
Vehicles
22 Lariat 502A EB BAP (ordered 1/15)
Another number to note is your order in line on that Blend day. Sequence (6791 on mine) number is a rolling number that doesn't really tell you much unless you know everyone else's. From what I've seen in other descriptions, this order number is where you are in line. Mine is 1005 out of 1695 on 6/10.

1654711821472.png
Mine says 51/410 but no modules populated yet. Hopefully that isn't a bad sign lol
 

cclark20

Well-known member
First Name
CD
Joined
May 30, 2021
Threads
1
Messages
164
Reaction score
171
Location
FL
Vehicles
22 F150 Platinum SuperCrew PB 4X4 BAP
Hmmm... I might be one of the only ones in this thread who ordered the 5.0. Although, with gas prices the way they are, I'm wondering if that was a smart decision. I almost wonder if that is why mine was built at the KC plant? Maybe not though?
You will love the sound and performance of the 5.0 Just a few cheap mods and that V8 will rumble like a truck should
 

Sponsored


Ziggus

Member
First Name
Brandon
Joined
Jun 3, 2022
Threads
0
Messages
6
Reaction score
13
Location
NH
Vehicles
2020 Chevy 1500 Trail Boss, 2022 F150 on order
Occupation
Systems Analyst

Howman59

Well-known member
First Name
David
Joined
Feb 23, 2022
Threads
1
Messages
102
Reaction score
116
Location
Nashville Area
Vehicles
2022 F150 PB On Order

shall

Active member
First Name
Sam
Joined
Jan 16, 2022
Threads
0
Messages
33
Reaction score
40
Location
Michigan
Vehicles
2022 F150 PB Lariat 502a

Ziggus

Member
First Name
Brandon
Joined
Jun 3, 2022
Threads
0
Messages
6
Reaction score
13
Location
NH
Vehicles
2020 Chevy 1500 Trail Boss, 2022 F150 on order
Occupation
Systems Analyst
Mentioned earlier in the thread, but it will take 1-3 days after blend date for modules to populate.
Thank you! Sorry was starting to get nervous, I ordered back in January and heard nothing until a few weeks ago..
 

Dreyer51

Member
First Name
Dave
Joined
Jan 11, 2022
Threads
0
Messages
5
Reaction score
0
Location
Franktown, CO
Vehicles
2019 F250
I’ll add this in just in case anyone else got punted to next month:

Order confirmed 2/14/22.
Received email on 5/12/22 for scheduled production date of 6/6/22.
Received email on 6/7/22 for production date change to 7/4/22.
Sponsored

 
Last edited:
 




Top