Goldwing Guy
Active member
- Thread starter
- #1
The tracker has updated and the transit date says 10. It also says awaiting shipping, anyone know what this transit date means? I hope not the 10 month.
Sponsored
This is correct, the average time it takes to get to you.Ok, I will go out on a limb here and trust my dealer, Transit Date is the approximate number of days from shipment to delivery. At least on my first build that was the case. It was shipped on 6/10 had a Transit Date of 14 and an ETA of 6/24 (14 day window). See if that comes close to your situation. What was your shipped date? What is ETA? Does the Transit Date come close to the difference?
No ship date and no eta so it’s anyone’s guess what any of this means.Ok, I will go out on a limb here and trust my dealer, Transit Date is the approximate number of days from shipment to delivery. At least on my first build that was the case. It was shipped on 6/10 had a Transit Date of 14 and an ETA of 6/24 (14 day window). See if that comes close to your situation. What was your shipped date? What is ETA? Does the Transit Date come close to the difference?
Wait, you have a transit date but no ETA? Check the mache vin tracker, my data has shown up there first on both my builds.No ship date and no eta so it’s anyone’s guess what any of this means.
As I said before it is just an estimated shipping time. For me it says 16 days on the mach-e transit date as well as 16 days on the attached for tracker. It it doesn't matter the date the truck ships, it is saying it estimates 16 days from the ship date. The number is that number even if it ships on the 5th, 5th, or 25th of the month. The transit day will be the same. Think of it as a counter not a day of the month. My Mach-E was 40, there is no 40th in the Julean calendar.No ship date and no eta so it’s anyone’s guess what any of this means.