Late May sounds about right.Waiting for a vin. Hopefully I will have a vin in May. I have no idea how long it will take after I get a vin to get a production date due to the chip shortage.
I placed my order on March 20th.Waiting for a vin. Hopefully I will have a vin in May. I have no idea how long it will take after I get a vin to get a production date due to the chip shortage.
That’s great. Which truck did you order? Also if you have a lease that’s ending, check the blue book value, the used truck prices are very high.I placed my order on March 20th.
Processed on March 23rd.
Got my VIN last week.
Expect to see my truck sometime in July-August.
...maybe
I ordered an Antimatter Blue Regular Cab Short Bed XLT 4X4 5.0 with every option available except power rear window power tailgate block heater and Active Prep although I did get Asist.That’s great. Which truck did you order? Also if you have a lease that’s ending, check the blue book value, the used truck prices are very high.
call your salesman and see about getting it changed up to a 10Priority code 19
11-19 are what the dealers can assign them to but at this point it does not matter with the shortages, if you have a stock truck that does not need the chip set it will be built before the retail orders that need it...call your salesman and see about getting it changed up to a 10