Mtnman1
Well-known member
Dont they need to schedule Job 2's before 3/21?It's reputable, usually reposted here.
I'm sticking to my prediction of no more VINs until after Job 2 starts on 3/21.
Sponsored
Dont they need to schedule Job 2's before 3/21?It's reputable, usually reposted here.
I'm sticking to my prediction of no more VINs until after Job 2 starts on 3/21.
This makes sense to me.I think we’ve been reading this schedule wrong…
https://www.f150gen14.com/forum/threads/-2022-f-150-scheduling-next-week-2-7-for-build-week-3-21-job-2-start-up.8660/
3/21 “Job #2 startup scheduling”
Job #1 trucks are currently scheduled out through 4/4 (this is supposed to be the cleanup week and final week of Job #1)
I could be wrong, wouldn’t be the first time, but don’t be surprised if “No F-150 Scheduling for 3/7” hits later this week.
Edit: Job #2 builds will begin getting scheduled as early as 3/21 for the the week of 4/11 unless Job #1 gets extended (wouldn’t rule it out at this point, check my sig)
I've been following the Blue Oval forum notes for some time now and when my wife's bronco was scheduled what was under column "Scheduling for Build Weeks" matched the week she was scheduled.This makes sense to me.
Job #2 starts production 3/21.If we have a VIN and a scheduled build date is that Job 1 or Job 2?
Same. Got the email tonight at 8 for 3/28 week. Platinum PB ordered on 8/9My Lariat BAP was scheduled today, Friday evening. Just received an email saying I’m in week 3/28.
Anybody else?
Ditto. Email yesterday (Friday) at 5:05 PM PT for 3/28 week. Limited PB ordered 12/20.Same. Got the email tonight at 8 for 3/28 week. Platinum PB ordered on 8/9