Sponsored

Kansas City plant are they up and running

JayceeP

Well-known member
Joined
May 13, 2021
Threads
3
Messages
294
Reaction score
203
Location
CAN
Vehicles
F150
Hopefully it’s built this week,
I also don’t think it’s a coincidence that April 21 was a Wednesday and May 6/7 were a Thursday Friday. You are imminent for production. I’m a May 7 blend and 1800+ sequence number myself.
Sponsored

 

LeadFoot-Lariat

Well-known member
Joined
May 21, 2021
Threads
14
Messages
178
Reaction score
96
Location
Oakville
Vehicles
21 F150 Lariat
Hope your right,I know there’s guys out here since October November waiting but 6 months for me is a long time..plus I don’t see any of the plants going back to normal production till the fall at the earliest and with ford launching so many vehicles this year there going to be really picky who gets the parts first…
 

tbone-CO

Well-known member
Joined
Feb 26, 2021
Threads
0
Messages
51
Reaction score
45
Location
CO
Vehicles
21 F150 Scab XLT Leadfoot
Occupation
button pusher
Ordered 2/12, 4/19 blend, sequence 4926, completed yesterday!
 

Djlee1592

Well-known member
First Name
Dave
Joined
Jan 19, 2021
Threads
9
Messages
225
Reaction score
170
Location
Upstate New York
Vehicles
2021 F-150
Occupation
industrial mechanic
I have a blend date of April 21 seq 7832. Still show a 1990 -01 - 01 ETA date
hopefully it will change tomorrow.
Hey, did yours update yet? Hoping it is, so we can confirm this scheduling theory
 

Sponsored

JayceeP

Well-known member
Joined
May 13, 2021
Threads
3
Messages
294
Reaction score
203
Location
CAN
Vehicles
F150
So from what I see- blends from April 15?? up to April 21 with 7063 sequence # got built since KC opened last week. I’m not sure what the actual starting blend was but it seemed like April 15 was it.

The 7063 sequence # above shows on its window sticker that it has a spray in liner so it obviously won’t ship right away assuming no chip issues. The trackers ETA for it is August 3rd.
 

Djlee1592

Well-known member
First Name
Dave
Joined
Jan 19, 2021
Threads
9
Messages
225
Reaction score
170
Location
Upstate New York
Vehicles
2021 F-150
Occupation
industrial mechanic
What is the theory? Interested in your thoughts.
Ive been going off JayceeP research. Basically that KC is building trucks in order of when the plant shut down. Many trucks with April blend dates seem to have been built. Nobody seems to have a blend between April 21 and May 6 for KC. Mark has a high sequence number. I dont know how high that number goes but if all this is true, mine should be getting built soon. I have a May 6th blend 1046 sequence on my window sticker. I will say I have a spray liner and wheel well liners so we'll see what happens.
 

jcarrico

Well-known member
Joined
Feb 7, 2021
Threads
3
Messages
111
Reaction score
28
Location
NYC
Vehicles
5
Ive been going off JayceeP research. Basically that KC is building trucks in order of when the plant shut down. Many trucks with April blend dates seem to have been built. Nobody seems to have a blend between April 21 and May 6 for KC. Mark has a high sequence number. I dont know how high that number goes but if all this is true, mine should be getting built soon. I have a May 6th blend 1046 sequence on my window sticker. I will say I have a spray liner and wheel well liners so we'll see what happens.
Interesting. So it seems they are likely running at least a week behind in terms of stated blend dates being produced? (For example, if pre June blend dates are still coming off the line, those from last week are not in the pipeline yet either. )
 

Djlee1592

Well-known member
First Name
Dave
Joined
Jan 19, 2021
Threads
9
Messages
225
Reaction score
170
Location
Upstate New York
Vehicles
2021 F-150
Occupation
industrial mechanic
Interesting. So it seems they are likely running at least a week behind in terms of stated blend dates being produced? (For example, if pre June blend dates are still coming off the line, those from last week are not in the pipeline yet either. )
Yeah it could be due to the reopening being only 1 shift too. We'll just have to wait and see. There seem to be a good number of people with May 6 and 7 blend dates. I'm not sure where they line up after that
 

Sponsored


Bri83oct

Active member
First Name
Brian
Joined
Jun 15, 2021
Threads
0
Messages
35
Reaction score
15
Location
Cincinnati, OH
Vehicles
2021 F150 Lariat
I just got pushed from an ETA End Date of 7/12 to 7/23. Still in production purgatory.

Blend Date: 4/19
Sequence Number: 5700

Receipt Date2021-03-06
ETA End Date2021-07-23
Production Date2021-06-17
 

RJL1400

Well-known member
First Name
Big Red
Joined
Jun 16, 2021
Threads
16
Messages
329
Reaction score
154
Location
New York
Vehicles
formerly had 2008 Toyota Tundra
Occupation
retired
Afternoon,I have had 3 different build dates starting April 5th and through my contact at the plant it was supposed to be built may 7th and after rechecking it’s supposed to be built this week but I’m still showing in production with a date of 1990..I ordered it Jan 28.
That is horrible. Sorry for you really.
 

Djlee1592

Well-known member
First Name
Dave
Joined
Jan 19, 2021
Threads
9
Messages
225
Reaction score
170
Location
Upstate New York
Vehicles
2021 F-150
Occupation
industrial mechanic
I just got pushed from an ETA End Date of 7/12 to 7/23. Still in production purgatory.

Blend Date: 4/19
Sequence Number: 5700

Receipt Date2021-03-06
ETA End Date2021-07-23
Production Date2021-06-17
Do you have any options that could cause delay?
 

xtraman122

Well-known member
First Name
Pete
Joined
Apr 15, 2021
Threads
12
Messages
728
Reaction score
630
Location
MA
Vehicles
‘21 302A PB
I just got pushed from an ETA End Date of 7/12 to 7/23. Still in production purgatory.

Blend Date: 4/19
Sequence Number: 5700

Receipt Date2021-03-06
ETA End Date2021-07-23
Production Date2021-06-17
That's pretty common once you're built. Myself and several others all had their ETAs jump a week to 10 days once they came off the line, and is usually a sign you did at least get built, then once it ships it seems like it usually comes back down to the original ETA, or close to it anyway. If shipping out of KC is anything like Dearborn, it should arrive a decent amount ahead of schedule. Virtually everyone from Dearborn has been beating their ETAs by a week or more.
 

jcarrico

Well-known member
Joined
Feb 7, 2021
Threads
3
Messages
111
Reaction score
28
Location
NYC
Vehicles
5
I just got pushed from an ETA End Date of 7/12 to 7/23. Still in production purgatory.

Blend Date: 4/19
Sequence Number: 5700

Receipt Date2021-03-06
ETA End Date2021-07-23
Production Date2021-06-17
Bro, You really tripped me out for a minute, until I saw you are in Cincinnati. I've been following your order on the ford tracker for a couple weeks because yours is coming from the same dealer as mine. :)

Trying to see how long it takes you to get delivered.

As a data point for you. My original order (I reordered) a couple months ago that was coming from Dearborn took 7 days to arrive once it shipped.
Sponsored

 
 




Top