Thinking about my Lightning purchase, I’m already reaching out to ComEd for service upgrade options. I think in Illinois, the state will pay for 50% of the costs for an electrical upgrade for a charging station for a BEV. But, I already have a 60A breaker feeding a 100A panel in my poke barn. I only have the 60A breaker because a 100A wasn’t available at the store when the electrician was switching out my house 100A to a 200A service.

Anyway, this has me thinking. I can easily upgrade the breaker to the barn to an 80A or 100A breaker, but is an 80A breaker REALLY required for Fords 80A charger? This does not make sense. Many, many, many homes today have 100A services. That has me thinking, drawing 80A from these homes would be detrimental IF 80A is truly needed. This could shoot the EV market in to foot before it even gets to start.

I thought sharing at night, late, could minimize impact to my panel draw as not a lot of current is needed at Kate night, BUT I have a 200A main panel serving a 100A sub panel in my barn. If Joe Everyday has a 100A panel only, that leaves 2OA for EVERYTHING else. If that’s the case, should I worry? Will the Ford 80A charging station require a sustained 80A?
Advertisement

 

Starkiller

New member
Joined
Jul 6, 2021
Messages
2
Reaction score
0
Location
Chicago, IL
Vehicles
2017 Chevy Equinox
Occupation
Attorney
Hi,

Fellow Illinoian (Illinoisan?) here. According to some interviews I've seen from Ford (Sources below) there will need to be a 100 amp breaker available. Knowing this, and having recently bought a Tesla Model Y (we are going full electric) I knew that in order to accommodate the lightning and the model Y, we would have to upgrade our existing 100 amp service to a 200 amp service panel.

I also talked to an electrician who told me that to accommodate the power requirements of the Lightning (based on the 100 amp breaker required), it is most likely going to require a 100 amp/240 volt line. Personally, I am not an electrician and haven't heard anything very 'official' from Ford yet so take this with a grain of salt. Personally I would wait before you do anything until Ford comes out with some real numbers and requirements.

Source: https://www.caranddriver.com/news/a36480020/2022-ford-f-150-lightning-charge-station-pro-explained/
 
OP
OP

Smokewagun

Active member
First Name
Bob
Joined
Jun 7, 2021
Messages
36
Reaction score
26
Location
N. Illinois
Vehicles
2019 Ford F-150 Lariat 3.0L Stroke
Thanks for the reply.
That tells me I should be good with a 100A breaker to my barn, which is fed off my 200A main house panel.
I need to figure this all out before the order bank opens. I think I’m very close to the front of the line. Work is even installing a charger for me in 2022. I can’t get a Lightning and then find out I need to upgrade the service. ComEd came out and said they’d give me a ballpark number for a service upgrade and an option for a new independent service to my barn. $4700 was thrown around just for the wiring in ground. If that’s the case, I’ll stick with an ICE.
 

jefro

Well-known member
Joined
Oct 28, 2021
Messages
139
Reaction score
45
Location
Texas
Vehicles
F150, Corvette, Bolt EV,
Maybe. 100 A at panel may or may not be 100 A at some barn. Ampacity of cables and length may need to be calculated.
Also the 80 A charger is supposed to be a dedicated 100 A circuit.

Pretty sure one could adjust maximum charge either at truck or charger but it's really not suppose to be the way to protect a circuit.

The truck may for some time take the full or near full 80 A but it would depend on a few variables. The charge level of the battery, temperature.

Some of the utilities may offer money but require a smart meter to turn or the charger. That charger will most likely have the ability sooner or later that allows power companies to regulate it I'd think. No way to let unlimited charging on US wide scales.
 

Roy2001

Well-known member
Joined
May 27, 2021
Messages
61
Reaction score
25
Location
US
Vehicles
Honda Odyssey
80A charging requires a 100A breaker. Your panel should be 200A or higher. 80A charger would be hard wired to panel directly. Unless overnight charge is not OK, I would look for regular 40A charging as you would never need to charge from 5% to 100%. More practically, it would be 20-80%.
 

jefro

Well-known member
Joined
Oct 28, 2021
Messages
139
Reaction score
45
Location
Texas
Vehicles
F150, Corvette, Bolt EV,
Most EV's have a setting for the amount of L1 and L2 charge amounts.
This truck should also have them. At the max setting and assuming things, it could indeed draw 80A for hours. My cars have drawn the max I set the evse and meter seems to be quite constant over the best charge conditions. It will taper off or taper up as conditions warrant.
 

beatle

Well-known member
Joined
Jun 1, 2021
Messages
69
Reaction score
50
Location
Springfield, VA
Vehicles
Model S, Ridgeline, Miata, motorcycle(s)
If it's anything like the Tesla HPWC, the box will have options inside to select the appropriate amperage for the wires coming into it. You won't need 100A service if you only plan to charge at say 40A.

I have a 14-50R in my garage for my Model S. I plan to convert it to a hard wired Ford box and then just set the box to reflect a 50A breaker so it charges at a maximum of 40A. Some boxes have hard switches inside to set the max current, others use an app.
 

Garbone

Active member
First Name
Gary
Joined
Nov 20, 2021
Messages
28
Reaction score
25
Location
FL
Vehicles
MachE, Explorer,C10
A breaker can run at 80% of their peak rating continously so a 100amp breaker does 80amp continuous and 100amp peak load.
 

Derek Beeston

New member
First Name
Derek
Joined
Nov 24, 2021
Messages
1
Reaction score
0
Location
Nanaimo
Vehicles
2018 Ford F-150, 2019 Ford Expedition
Occupation
School Principal
Does anyone know when the charging station will be available for purchase? Doing a Reno and would like to build it in. Also is there a spec sheet on it for my electrition to pre-wire? In interested in hooking it up to solar panels and looking for info on if it would pay for the solar installation in the first 100 years....lol.

Thanks
 

Nick Gerteis

Well-known member
First Name
Nick
Joined
Jun 30, 2021
Messages
84
Reaction score
72
Location
Mississippi
Vehicles
98 F-150, 2015 Nissan Leaf, Lightning preordered
Occupation
Letter carrier
Does anyone know when the charging station will be available for purchase? Doing a Reno and would like to build it in. Also is there a spec sheet on it for my electrition to pre-wire? In interested in hooking it up to solar panels and looking for info on if it would pay for the solar installation in the first 100 years....lol.

Thanks
Somebody at Ford knows. They aren’t sharing right now, wish they would. I guess you could call them, be sure to share what you find out!
 

jefro

Well-known member
Joined
Oct 28, 2021
Messages
139
Reaction score
45
Location
Texas
Vehicles
F150, Corvette, Bolt EV,
Standard 100A service to the unit if hardwired.
Unknown how to connect the ABT to it.
No way Ford is actually building it so maybe if someone knew the company the mach-e charger they might follow. Then see if any specs leaked online.
 
Last edited:

gwrace14651

Member
Joined
Nov 22, 2021
Messages
10
Reaction score
8
Location
Round Rock, TX
Vehicles
2004 Ford Excursion 4x4 PSD
A breaker can run at 80% of their peak rating continously so a 100amp breaker does 80amp continuous and 100amp peak load.
That is actually the NEC rules. Breaker and circuit should always be 20% higher than the max amp draw. All of your 240 volt 40 Amp power stations require a 50 amp breaker and 6 gauge wiring.
 