Im in a similar situation (KC build- Lariat- 502A- wheel well liners)6/30 Blend
7/2 Production = still not showing built
7/30 ETA Start Date
8/5 ETA End Date
In Production has no check mark and the order is not marked as built which I assume means it's waiting on wheel well liners.
Let's go! Congrats!
Not yet...it seems to be running about 18 to 20 hours behind. The MachE tracker has been the most accurate for me.Let's go! Congrats!
So, did the Ford tracker officially update to "Built"?
Sequence number is 1992Lucky dog!
What is your sequence number? What trim did you order?
Do you mind to post a screenshot of the ford tracker?
Mine did that for a few days as well. Not sure why it happened!My window sticker has completely dropped off the tracker as of this morning. Things are taking a turn for the worse!
Frustrating when it feels like you’re so close!Mine did that for a few days as well. Not sure why it happened!
Driving me insane!! Not sure how many times I check the tracker in a day.Frustrating when it feels like you’re so close!
Where do you stand with your truck — did it get delivered yet?
Receipt Date | 2021-04-24 |
ETA End Date | 2021-07-15 |
Production Date | 2021-06-25 |
Ship Date | 2021-07-01 |
I can tell you I got off the phone with a Ford rep doing a lot of back tracking.Driving me insane!! Not sure how many times I check the tracker in a day.
Tracker has:
Ford Site:
Receipt Date 2021-04-24 ETA End Date 2021-07-15 Production Date 2021-06-25 Ship Date 2021-07-01
Built: 6/30
Shipped says : "Est. 11 days"
Anywhere between 7/9 and 7/15. Built in Dearborn! I'm crawling out of my skin waiting for that phone call!!!!! I called the dealership today and all they could tell me was that its still in Transit. I feel as though I may need to bring out the "Karen" side soon and speak to a manager.