Sponsored

6/14 Build Week

stangsandatruck

Well-known member
First Name
Chris
Joined
Mar 15, 2021
Threads
5
Messages
105
Reaction score
102
Location
NE Pennsylvania
Vehicles
2015 Mustang GT, 2021 F150 XLT 302A
Occupation
Software Engineer
I was originally scheduled for a 5/29 build date, but since KC will still be shut down for that week, I have been bumped to the 6/14 build week. Who else has this week?

Space White 302A XLT 2.7 V6 - "planned" build date of 6/16
Sponsored

 

jhopkinson

Well-known member
First Name
John
Joined
Aug 21, 2020
Threads
3
Messages
53
Reaction score
41
Location
Ohio
Vehicles
2018 F150, 2013 Shelby GT500
Occupation
Tech Director
I am also 6/14 build week, did not get the day yet.
 

docprego

Well-known member
Joined
Aug 6, 2020
Threads
12
Messages
138
Reaction score
106
Location
Henderson, Nevada
Vehicles
2018 Alfa Romeo Giulia
I'm also scheduled for the 6/14 build week. This is my third scheduled week but just got my day assigned today to 6/17. Though my previous 2 scheduled weeks also had a day scheduled, I am thinking (hoping) this one might be more significant with KC reopening.
 

CommoSGT

Well-known member
First Name
Ken
Joined
Mar 26, 2021
Threads
2
Messages
197
Reaction score
148
Location
Kentucky
Vehicles
2016 F150 Lariat SCrew, 2021 F150 Lariat SCrew
Occupation
Engineer
Week of 6/14 KC build. I lost count of the number of delays (3 I think), but my trunk is Leadfoot 6 1/2 ' bed, FX4 SCrew, Lariat 502a with a moon roof. Told today I am planned for a 6/17 build day. Guess we'll see.
 

Knickell

Well-known member
First Name
Kyle
Joined
Aug 1, 2020
Threads
154
Messages
2,603
Reaction score
2,826
Location
Florida
Vehicles
Mazda Protege, Ford F-150
I'm also scheduled for the 6/14 build week. This is my third scheduled week but just got my day assigned today to 6/17. Though my previous 2 scheduled weeks also had a day scheduled, I am thinking (hoping) this one might be more significant with KC reopening.
Third time better be the charm!
 

Sponsored

Knickell

Well-known member
First Name
Kyle
Joined
Aug 1, 2020
Threads
154
Messages
2,603
Reaction score
2,826
Location
Florida
Vehicles
Mazda Protege, Ford F-150
Good luck to you gents on the 6/14 build week. We’ve got to be getting close to the end of production for the model year, and a last big run of 2021s.

The factories have to start being configured for the 2022 models sometime very soon.
 
OP
OP
stangsandatruck

stangsandatruck

Well-known member
First Name
Chris
Joined
Mar 15, 2021
Threads
5
Messages
105
Reaction score
102
Location
NE Pennsylvania
Vehicles
2015 Mustang GT, 2021 F150 XLT 302A
Occupation
Software Engineer
Good luck to you gents on the 6/14 build week. We’ve got to be getting close to the end of production for the model year, and a last big run of 2021s.

The factories have to start being configured for the 2022 models sometime very soon.
I know they are gearing up for MY 2021 Job 2 which I know in previous years lasted until early fall, but with the year we have been having who knows - they may be building 21s until new years eve.

I know the Super Duty trucks are going to start 2022 models this summer, with the new giant Sync 4 screen.
 

docprego

Well-known member
Joined
Aug 6, 2020
Threads
12
Messages
138
Reaction score
106
Location
Henderson, Nevada
Vehicles
2018 Alfa Romeo Giulia
Week of 6/14 KC build. I lost count of the number of delays (3 I think), but my trunk is Leadfoot 6 1/2 ' bed, FX4 SCrew, Lariat 502a with a moon roof. Told today I am planned for a 6/17 build day. Guess we'll see.
My situation sounds the same as yours, week of 6/14 and just got assigned to day of 6/17. I ordered on 2/27, when did you? I have spray in bedliner, wheel well liners, and max tow. Do you have any of those?
 

Seavee33

Well-known member
Joined
Apr 16, 2021
Threads
6
Messages
161
Reaction score
78
Location
Miami, Fl
Vehicles
'13 F-150, Ordered 2021 Lariat
Occupation
Electrician/ Project Manager
I don't even know what build week I'm in anymore.
I was bumped 3 times due to shut downs and i can't get any info not even from my dealer. My last build date was May 24 following the pattern I'm guessing i have a 6/7 build week.
 

F150ROD

Well-known member
Joined
Apr 14, 2021
Threads
28
Messages
981
Reaction score
963
Location
SoCal
Vehicles
F150 XLT on Order/Mazda Roadster Club/Model 3
Occupation
U.S. Navy Retired/Student
Just got bumped from 5/24 to 6/14, let the games begin!
 

Sponsored


CommoSGT

Well-known member
First Name
Ken
Joined
Mar 26, 2021
Threads
2
Messages
197
Reaction score
148
Location
Kentucky
Vehicles
2016 F150 Lariat SCrew, 2021 F150 Lariat SCrew
Occupation
Engineer
My situation sounds the same as yours, week of 6/14 and just got assigned to day of 6/17. I ordered on 2/27, when did you? I have spray in bedliner, wheel well liners, and max tow. Do you have any of those?
I ordered 22 March. I have factory wheel well liners and dual panel roof, 360 cameras, FX4, Lariat sport, and 20' dark rims. I am frustrated with the changes.... I wanted to add the ACTIVE PREP system to my truck but the dealer told me it was locked the day it was accepted. 3 days later I got a VIN and he told me all I could have changed up to that point would have been to change the paint and that would delay it....not like it was going to be built that day.
 

Tjbev13

Active member
Joined
May 6, 2021
Threads
7
Messages
36
Reaction score
39
Location
Texas
Vehicles
'21 F150 XLT 302A, 3.5EB, Max Tow, FX4
Occupation
Turner of wrenches
Also scheduled the week of the 14th in Dearborn.
 
OP
OP
stangsandatruck

stangsandatruck

Well-known member
First Name
Chris
Joined
Mar 15, 2021
Threads
5
Messages
105
Reaction score
102
Location
NE Pennsylvania
Vehicles
2015 Mustang GT, 2021 F150 XLT 302A
Occupation
Software Engineer
I ordered 22 March. I have factory wheel well liners and dual panel roof, 360 cameras, FX4, Lariat sport, and 20' dark rims. I am frustrated with the changes.... I wanted to add the ACTIVE PREP system to my truck but the dealer told me it was locked the day it was accepted. 3 days later I got a VIN and he told me all I could have changed up to that point would have been to change the paint and that would delay it....not like it was going to be built that day.
I ordered 3/15. 302A 2.7 XLT 5.5' bed w/ tow tech, dual panel roof, sport. I think you were also on the same build week as me before, so it seems like they are keeping somewhat the order of scheduling when they move it to a new week.

I know Ford wants to send the KRs, Platinums and Limiteds out so they can profit the most, but there is a growing backlog of KC trucks that need to be built, and since the VIN is generated they cannot swap plants.
 

CommoSGT

Well-known member
First Name
Ken
Joined
Mar 26, 2021
Threads
2
Messages
197
Reaction score
148
Location
Kentucky
Vehicles
2016 F150 Lariat SCrew, 2021 F150 Lariat SCrew
Occupation
Engineer
since the VIN is generated they cannot swap plants.
I have a Leadfoot 6.5' bed 5.0L and I was under the understanding that they locked me in at KC. But the whole "you have a VIN you are locked" thing....it is a computer file. I have done too much coding to 1)buy that line, and 2) drive a truck using Bluedrive? until it is a year or more old. Look at Boeing with the 737 Max and the Boeing Starliner. Code review is a very critical job...and the ounger crowd that can't decide what bathroom they belong in do not give me much reason to trust their work....
 

ColoradoHunter

Well-known member
First Name
Dennis
Joined
May 10, 2021
Threads
10
Messages
316
Reaction score
294
Location
Colorado
Vehicles
2021 F150 King Ranch 4x4
Occupation
Retired
I got a build week of 6/14 in Dearborn from my dealer the yesterday. I originally ordered on 3/29. Although the dealer assured me my order was in and everything was fine, it wasn't, he never submitted the order to Ford. With a bit of luck I found out that the order was never submitted. I went to a different dealer on 5/7 and ordered the truck. I explained what happened and he said he would contact Ford and see if they would do anything for me. Thanks to the dealer and Ford from the dates I see on these threads they bumped me up to a build date that is about what I should have had if the first dealer had done his job.
Sponsored

 
 




Top