Notes:
• Production Week at DTP: 11/25
• SIMS orders were created this weekend for F-150
• DTP: 25MY - Scheduling. (For reference check the Clean-up Notes)
• KCAP: No scheduling.
Required Orders:
- 25MY DTP only content and Raptor/ Raptor R orders
Key Dates:
- Spec changes and cancellations for 24 MY were shut off on 8/29.
Limited Availability:
- 995 - 5.0L Engine
- 998 - 3.5L Engine
• Production Week at DTP: 11/25
• SIMS orders were created this weekend for F-150
• DTP: 25MY - Scheduling. (For reference check the Clean-up Notes)
• KCAP: No scheduling.
Required Orders:
- 25MY DTP only content and Raptor/ Raptor R orders
Key Dates:
- Spec changes and cancellations for 24 MY were shut off on 8/29.
Limited Availability:
- 995 - 5.0L Engine
- 998 - 3.5L Engine