Needanamefornonsense
Member
- Joined
- May 13, 2022
- Threads
- 1
- Messages
- 8
- Reaction score
- 0
- Location
- Washington
- Vehicles
- 2022 F150 502a PB
- Thread starter
- #1
I ordered when the 2022 (in November 2021) order guide wasn't available and really got screwed by the zone lighting and boxlink being included on the 2021 build sheet I submitted... Any idea how to retrofit as much of the package as possible? I also got stuck with a "Being built" status back on 1/28 so my dealer said there was nothing they could do. I got my ship notification last night so any knowledge is helpful.
Edit: More context, 502a Lariat PB long bed.
Edit: More context, 502a Lariat PB long bed.
Sponsored
Last edited: