Anither endorsement here for Dustin. I think he’s the best. I always appreciate his evangelism for electricians to professionally practice their craft.
It looks like the confusion is that the original electrician's estimate for the EVSE circuit is for an 80 Amp circuit, not a 100 Amp protected continuous 80 Amp load.
...including how internal combustion engines lose $3.00 of that $4.00/gallon of gasoline in heat, internal friction losses, etc. That would be 27 gallons of the 36 gallon tank example above.
Good luck. Dealers have a lot of power in halls of state governments.
In my state, no pricing is final until you have signatures on a final purchase agreement. Perhaps, if you have an email or similar written commitment not to charge ADM, you could claim something. In any event, what are your...
It depends on whether you want the 14-50R receptacle to pass an inspection without a neutral.
You could always buy the Home Flex with a NEMA 6-50P plug on its cordset and install a NEMA 6-50R receptacle. If I had any thoughts of downgrading from hard-wired 48 Amp charging to 40 Amp charging...
I have a Lectron 40 Amp, also. Beware Tesla Generation 2 Wall Connectors that can deliver the full 80 Amps that Lightning will be requesting. I had a brief email back and forth with Lectron about their 40 Amp rating. I pointed out that it is very common that hard-wired Wall Connectors are...
CTA 2045 addresses this building block of smart grid utility initiated demand management.
https://shop.cta.tech/products/modular-communications-interface-for-energy-management
Great idea! I'd like to be able to pitch a tent on top of a properly strengthened tonneau cover with a tent design that attaches to the bed rails in some form.
I agree, but their lack of transparency qualifies as a shenanigan when advertising a vehicle that has never seen their lot, and cannot be sold for six+ months. Sure, an ad that isn't transparent would be but a drop in the ocean of deceptive ads....
I don't think anyone is suggesting that they rip out all of their fossil pumps on Day 1 to install DCFC. As you said, it's a transition. Fossil fuels will be around for many years. My thought is that public seed money would be well-spent to align and combine new charging locations with existing...
Existing Wawa, QuikTrip, Sheetz, Royal Farms, and the other regional pumper/convenience mega-marts are the locations that I think are most important to enlist for DCFC locations.